Museum of the Second World War / Gdańsk
DESIGN
Museum of World War II was created at the site of the current bus loop at Wałowa Str. The concept was to combine modern exposure with the reconstruction of destroyed buildings, which look like parts of war computer games in which the enemy shoots. Real buildings adjoin giant screens composed of screens which display historical images. Everything is kept in a dark climate. According to the premise, the spectator is aware of the events of war, the fate of the people, and in all is the history of Gdansk
Technical parameters | ||
Area | 57 386 m2 | |
Investment | 358 mln zl | |
Year of construction | 2017 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete ABT-Venas system in accordance to currently applicable regulations.
The number of central VES | 1 |
Number of loudspeaker lines | 40 |
Total numer of loudspeakers | 971 |
Total loudspeakers power W | 5203 |
Delivered devices | ||
Control units | ABT-V2000 | 1 |
Loudspeakers | ABT-LA30 | 10 |
ABT-S2010 | 287 | |
MCR-SWSM6 | 268 | |
MCR-SMSP20 | 321 | |
ABT-T1510 | 85 | |
Microphones | ABT-V200MS | 2 |
ABT-V200M | 3 | |
Power Amplifiers | ABT-V2064WM | 4 |
ABT-V2122WM | 6 | |
ABT-V2241WM | 9 | |
ABT-V2421WM | 13 |
Mennica Residence / Warsaw
DESIGN
“The inspiration for Mennica Residence comes from a journey to New York – the Everest of exquisite apartment towers. Moderation, pragmatism and quality make the buildings of Manhattan a model for urban residences. Two towers flanking the entrance at the corner of Grzybowska and Żelazna form a distinct and characteristic spatial arrangement. The smooth, geometrical elevation is designed from noble materials that age well. The moderation in choice of esthetic devices and the timelessness shall be the brand marks of Mennica Residence”.
Wojciech Kotecki, studio Brzozowski/Grabowiecki Architekci Sp. z o.o.
Technical parameters | |||
Area | 20 000 sqm. | ||
Investment | 59 mln zł | ||
Number of floors | 18 | ||
Year of construction | 2016-2020 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete MultiVES system in accordance to currently applicable regulations.
The number of VES | 1 |
Number of loudspeaker lines | 34 |
Total numer of loudspeakers | 425 |
Total loudspeakers power W | 2799 |
Delivered devices | ||
Control units | ABT-CU-11LT | 1 |
ABT-CU-11LCD | 1 | |
Loudspeakers | MCR-SMSP20 | 199 |
ABT-S206 | 45 | |
ABT-W6 | 181 | |
Microphones | ABT-DMS | 1 |
ABT-DFMS | 1 | |
Power Amplifiers | ABT-PA2650B | 2 |
ABT-PA8160B | 2 |
Aquamarina apartments / Świnoujście
DESIGN
AQUAMARINA is a complex of five-storey buildings with residential apartments for sale with various sizes from 37 to 82 sqm. and parking spaces in the underground garage. All apartments have large, spacious balconies or terraces with areas ranging from a dozen to several dozen square metres.
Technical parameters | |
Area | 27 337 sqm. |
Number of buildings | 5 |
Investment | 40 mln zł |
Construction year | 2018 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete MultiVES system in accordance to currently applicable regulations.
Number of central VES | 1 |
Number of loudspeaker lines | 18 |
Total numer of loudspeakers | 363 |
Total loudspeakers power W | 1045 |
Delivered devices | ||
Control units | ABT-CU-11LT | 1 |
Loudspeakers | ABT-S206 | 108 |
ABT-SMSP20 | 62 | |
ABT-W6 | 100 | |
ABT-T1510 | 93 | |
Microphones | ABT-DMS | 1 |
ABT-DFMS | 3 | |
Power Amplifiers | ABT-PA8160B | 2 |
Wybrzeże Theater / Gdańsk
DESIGN
The theater was founded in 1946. Initially, it operated under the name “Miejski Teatr Wybrzeże” with its headquarters in Gdynia and consisted of several stages also in Gdańsk and Sopot. From 1960, the theater operated on two stages (Gdańsk and Sopot). In 1967 Teatr Wybrzeże moved to a new headquarters in the Gdańsk Main Town, at Targ Węglowy (built in the place of the Municipal Theater dating from 1801, rebuilt comprehensively in 1933-1935 and destroyed at the end of World War II.) In 2002, a thorough modernization of the reconstruction was carried out the current theater facility.
Technical parameters | |
Number of seats | 420 |
Date of installation | 2018 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete MultiVES system in accordance to currently applicable regulations.
Number of central VES | 1 |
Number of loudspeaker lines | 14 |
Total numer of loudspeakers | 84 |
Total loudspeakers power W | 200 |
Delivered devices | ||
Control units | ABT-CU-11LCD | 1 |
Loudspeakers | ABT-S136 | 2 |
ABT-S206 | 27 | |
ABT-W6 | 52 | |
ABT-LA30 | 3 | |
Microphones | ABT-DFMS | 1 |
Power Amplifiers | ABT-PA8080B | 1 |
Regional Hospital / Poznań
DESIGN
The Provincial Hospital in Poznan is multifunctional providing comprehensive care along with full diagnostics and treatment in one facility, which significantly increases patient comfort and shortens the duration of stay.
Technical parameters | |
Area | 24 000 sqm. |
Number of floors | 8 |
Year of construction | 1973 |
Year of installation | 2017 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete MultiVES system in accordance to currently applicable regulations.
Number of central VES | 1 |
Number of loudspeaker lines | 28 |
Total numer of loudspeakers | 260 |
Total loudspeakers power W | 551 |
Delivered devices | ||
Control units | ABT-CU-11LT | 1 |
Loudspeakers | ABT-S136 | 22 |
ABT-S206 | 168 | |
ABT-W6 | 215 | |
Microphones | ABT-DMS | 1 |
ABT-DFMS | 1 | |
Power Amplifiers | ABT-PA8080B | 1 |
ABT-PA8160B | 215 |
Hospital / Włoszczowa
DESIGN
The hospital in Włoszczowa conducts medical, preventive and rehabilitation activities. The main goal of the plant is to take measures to protect and improve the health of the population by organizing and conducting medical, preventive and rehabilitation activities and constantly improving the quality of services provided, as well as promoting health-related behaviors and compliance with patient’s rights contained in the applicable regulations.
Technical parameters | |
Number of floors | 6 |
Year of construction | 1942 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete miniVES system in accordance to currently applicable regulations.
Number of central VES | 1 |
Number of loudspeaker lines | 8 |
Total numer of loudspeakers | 37 |
Total loudspeakers power W | 320 |
Delivered devices | ||
Control units | miniVES 40021 L | 1 |
Loudspeakers | ABT-T2215 | 12 |
ABT-S206 | 8 | |
ABT-W6 | 18 | |
Microphones | ABT-DMS | 1 |
Power Amplifiers | AKU 18-12 | 4 |
Hospital / Sucha Beskidzka
DESIGN
The hospital in Sucha Beskidzka was opened in 1982. It is one of the larger and more modern hospitals operating in the region. From the beginning of the operation, it has a good reputation, as evidenced by the use of medical services available here not only by local patients, but also by a large group of patients from outside the region.
Technical parameters | |
Number of floors | 7 |
Year of construction | 1982 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete miniVES system in accordance to currently applicable regulations.
Number of central VES | 1 |
Number of loudspeaker lines | 4 |
Total numer of loudspeakers | 127 |
Total loudspeakers power W | 160 |
Delivered devices | ||
Control units | miniVES 2001 L | 1 |
Loudspeakers | ABT-S206 | 21 |
ABT-W6 | 6 | |
Microphones | ABT-DFMS | 1 |
Power Amplifiers | AKU 18-12 | 4 |
Hospital / Czeladź
DESIGN
The hospital in Czeladź has a fairly long history. The opening ceremony was made on April 6, 1899. In the meantime, he underwent many renovations. The hospital has 450 beds and 40 neonatal beds.
Technical parameters | |
Number of floors | 4 |
Number of beds | 490 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete miniVES system in accordance to currently applicable regulations
Number of central VES | 1 |
Number of loudspeaker lines | 8 |
Total numer of loudspeakers | 15 |
Total loudspeakers power W | 320 |
Delivered devices | ||
Control units | miniVES 2001 L | 1 |
Loudspeakers | ABT-S206 | 14 |
ABT-W6 | 6 | |
Microphones | ABT-DFMS | 1 |
Power Amplifiers | AKU 40-12 | 4 |
Hospital / Radziejów
DESIGN
The Independent Public Health Care Center in Radziejów was put into use in 1979. The hospital in Radziejów was designed for 272 beds, four basic branches – internal, child, surgical, gynecological and obstetric. In addition, facilities were built to provide full diagnostic, logistic and administrative services, as well as the activities of specialist clinics and ambulance services.
The hospital provides preventive and curative services mainly for people residing in the Radziejów poviat and in the Kuyavian-Pomeranian Voivodeship. The first stage of providing medical services is basic health care, which is part of the health care system providing health and sickness services at home in outpatient or home settings.
Technical parameters | |
Number of wards | 4 |
Number of beds | 272 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete Venas system in accordance to currently applicable regulations.
Number of central VES | 1 |
Number of loudspeaker lines | 20 |
Total numer of loudspeakers | 375 |
Total loudspeakers power W | 700 |
Delivered devices | ||
Control units | ABT-V2000 | 1 |
Loudspeakers | ABT-S2010 | 39 |
MCR-SWSM6 | 336 | |
Microphones | ABT-V200MS | 1 |
ABT-V200M | 1 | |
Power Amplifiers | ABT-PA8080B | 1 |
ABT-PA8160B | 2 |
Mazowiecki Provincial Hospital Drewnica / Ząbki
DESIGN
Mazowiecki Provincional Hospital “Drewnica” is an institution for adults with mental disorders and is located in Ząbki near Warsaw. It was founded in 1903 and currently has 9 wards, including: 5 general psychiatric wards, rehabilitation, geriatric, detoxification and daycare wards.
Technical parameters | |
Area | 22 000 sqm. |
Number of wards | 9 |
Number of beds | 280 |
Housing estate “Browary Warszawskie” / Warsaw
DESIGN
The residential complex of Browary Warszawskie will be located in Warsaw within the Wola district, surrounded by Grzybowska, Wronia and Krochmalna Streets. The estate will be erected in 2016-2020. The office space of these eleven-storey residential buildings will reach 50,000. m2, while commercial 6 thousand. m2. The facility is an investment of Echo Investment, designed by architects from the JEMS Architekci studio, while the construction company Eiffage Polska Budownictwo is the general contractor. At the distance of 99 meters, Browary Warszawskie are created – Apartamenty przy Krochmalnej, stage B and C, 120 meters further there is an Office Building at the Gate, and 158 meters further there are Apartments Oxygen Apartments.
Technical parameters | |||
Area | 20 000 m2 | ||
Apartments | 1000 | ||
Number of floors | 11 | ||
Year of construction | 2016-2020 |
SOLUTION DELIVERED BY AMBIENT SYSTEM
Ambient System has delivered the complete MultiVES system in accordance to currently applicable regulations.
The number of VES | 1 |
Number of loudspeaker lines | 36 |
Total numer of loudspeakers | 881 |
Total loudspeakers power W | 2842,95 |
Delivered devices | ||
Control units | ABT-CU-11LT | 1 |
ABT-CU-11LCD | 1 | |
Loudspeakers | ABT-S206 | 659 |
MCR-SMSP20 | 42 | |
ABT-W6 | 178 | |
ABT-LA30 | 2 | |
Microphones | ABT-DFMS | 1 |
Power Amplifiers | ABT-PA8160B | 4 |